Recently, the new generation intelligent intercity EMU developed by CRRC arrived in Guiyang. The EMU comprises 4 cars (2 motor cars and 2 trailer cars), with a maximum operating speed of 200km/h and a capacity of 184 passengers. The train is only 101,4m long, enabling it to better meet the needs of intercity operation. It adopts the latest technology of the Olympics-version intelligent CR EMU and boasts many intelligent features. Meanwhile, to satisfy the operating needs of intercity operation, ...